1, How long does it take from the application to the receipt of the certificate?

90 days

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: 2 - 4 man day per model series

FI audit: 1 - 2 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is work audited?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

-Application form

License in copy

Questionnaire including brief information about the company, production process, list of core production facilities, list of core test instruments, proof of registered trademark, etc.

Car structure and technical parameters

-COP control plan

-Declaration: how is type, series defined

-Declaration: how is VIN defined

-Explanation: we distinguish the different types by external marking

-Declaration: Operating instructions in Chinese

-COC certificate

-Review

-Quality Manual

-Quality system certificates in copy

-Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

CCC Nuus

21 nuwe en hersiene GB Standaarde vrygestel 21 nuwe en hersiene GB Standaarde vrygestel 2019-04-19 - Volgens 'n onlangse pers van die Staatsraad van die PRC, ...
177 nuwe en hersiene GB Standaarde vrygestel 177 nuwe en hersiene GB Standaarde vrygestel 2019-04-04 - Volgens 'n onlangse pers van die Staatsraad van die PRC, ...
Daimler sal 500 miljoen euro belê om elektriese voertuie te produseer Daimler sal 500 miljoen euro belê om elektriese voertuie te produseer 2019-03-24 - Die Daimler-groep sal 500 miljoen euro belê (ongeveer ...
GB Standaarde vir China CCC motor produkte opgedateer GB Standaarde vir China CCC motor produkte opgedateer 2019-03-17 - volgens 'n onlangse aankondiging van CNCA (China National ...
Tesla Model 3 - China-markleweringseremonie Tesla Model 3 - China-markleweringseremonie 2019-03-15 - Op Januarie 22, 2019, die Model 3 China Markleweringseremonie ...
Motorvoertuig retroreflector produk CCAP-punt sertifisering Motorvoertuig retroreflector produk CCAP-punt sertifisering 2019-03-12 - Ten einde die gees van die China Nasionale Ce ...
gedetailleerde implementering reëls vir die hersiening van klank en video toerusting gedetailleerde implementering reëls vir die hersiening van klank en video toerusting 2019-03-10 - China Quality Certification Center (CQC) hersien die regulasie ...
Nuwe gedetailleerde implementeringsreëls vir mobiele kragtoevoer vir draagbare digitale toestelle gepubliseer Nuwe gedetailleerde implementeringsreëls vir mobiele kragtoevoer vir draagbare digitale toestelle gepubliseer 2019-03-08 - Volgens 'n onlangse aankondiging van die China Quality C ...
Tesla se superfabriek word in Shanghai gevestig Tesla se superfabriek word in Shanghai gevestig 2019-03-07 - Soos gerapporteer deur Sina Auto wat op Januarie 7,2019 Tesla CEO ...
gedetailleerde implementeringsreëls vir beligtingsapparate hersien gedetailleerde implementeringsreëls vir beligtingsapparate hersien 2019-03-06 - CQC (China Quality Certification Center) het onlangs hersien ...

Ondersteuning

Unterstützung

Jy werk teen jou pas. U kan u projekte selfstandig via ons portaal hanteer, sowel as navraag doen oor persoonlike ondersteuning. Ons het ons dus verbind tot die geleentheid om u eie prosesse te ontwerp

Aanlyn administrasie

Aanlyn administrasie

Ons bied u die geleentheid om u eie sertifiseringsproses uit te voer, maar sonder om die kundigheid of ondersteuning van ervare werknemers te verlaat. Die aanlyn stelsel is ontwerp vir 'n verskeidenheid van certificaties en bied u FAQ lyste, sowel as gereed gemaak vorms en tabelle, sowel as 'n module om oop vrae met een van ons werknemers te verduidelik.

Verander Sertifisering

Verander Sertifisering

In ons vinnige tyd is veranderinge in die sakelewe 'n konstante begeleiding. Dit kan baie vinnig gebreek word. Daar is interne en eksterne redes hiervoor. Die KS gee 'n oorsig van die ooreenstemming tydens veranderinge.

samewerking

Vennootskappe

Ons het slegs 'n beperkte tyd en finansiële vermoë, en wil 'n omvattende diens bied, samewerkings maak net sin tussen verwante organisasies. Dit het 'n betroubare struktuur, sowel as 'n goeie interpersoonlike harmonie.

Gaan na bo